Sort of worked on the RR over Christmas break. I made a plywood box to store the glass in and chrome trim parts. As I boxed the stuff up, I wondered when I might be getting the parts out of box again? Oh well, the project is 10 years and counting now, no real rush. Good thing about this project was that I got the glass off of the couch in the shop and Dad get's his napping couch back.
Actually, I got a few other things in-progress too. We are reorganizing the shop and putting in a sand blasting room. What this amounts to is me making a tarp to seal off part of the room. The advantage is that I'll be able to work on the RR for a few hours at a time and not have to spend hours moving stuff outside and setting up the sandblasting equipment, (which is a royal pain). This should really get things moving along and with minimal cost. The tarp was sort of expensive, but I bought some fabric from Rochford Supply in their closeout 2nds. Super cheap for what it is.
Thursday, January 5, 2012
Subscribe to:
Posts (Atom)